Tower Crane Gallery – 4

Tower Crane Gallery – 4

This is another view showing the dock with 2 tower cranes installed for the ship repairs or other marine services. The tower crane is sitting on the steel structures that are raised up by 4 steel columns, there are 4 struts linked between the edge of the steel foundation and the tower crane mast section.

The two tower cranes are on a fixed foundation rather than on a rail moving system, so the ship has to move along the rail to the working radius of the tower crane.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s