Tower Crane Gallery – 12

Tower Crane Gallery – 12

This picture is about the tower crane foundation, it shows the tower crane with 4 reusable fixing angles that are welded on 4 steel plates, and the steel plates are installed with 10 cast-in bolts per plate.

The picture shows the tower crane foundations with base mast, reusable fixing angles, steel plates with cast-in bolts, the level and position should be double checked because nothing can change once the concrete is poured.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s