Tower Crane Gallery – 26
A medium sized construction site with 4 luffing tower cranes erected and operated, a anti collision system is a must for this site because the overlapping zoning do exists for the cranes. And the most critical issue for this construction is the nearby railway station, the railway station should be the prohibited area on the anti collision system that prevent the cranes from entering into this area.